Skip to quote form
(647) 766-3512
5.0 on Google · 27 reviews

Engineered Storage Systems, Made in Ontario

Industrial racking manufactured with North American Steel, a Canadian manufacturer since 1972, and engineered around your building and your product.

  • Free on-site warehouse assessment and layout
  • Manufactured in Ontario, not imported
  • R-Mark certified by the Rack Manufacturers Institute
  • Factory direct pricing and lead times
Success Storage Solutions, executive partner of North American Steel

Get your free quote

Tell us about your warehouse. We'll size the right system and send real pricing, usually within one business day.

That didn't send. Call (647) 766-3512 or email sales@successstoragesolutions.com and we'll pick it up from there.
Add your name so we know who to reach.
We need a number to reach you.
That email doesn't look right.
Takes under a minute. No spam. A real person follows up. Prefer to talk? Call (647) 766-3512
20+ years in Ontario  ·  Trusted by Ford, Loblaws and Mercedes-Benz
10M+Sq ft supplied
20+Years in Ontario
12Racking systems
What we do

We make it, we design it, we deliver it

Our executive partnership with North American Steel means your racking is manufactured at their Ontario plants and comes to you factory direct. No importer, no middleman, no six week wait on a container.

Design and layout

We measure clear height, aisle widths and product flow, then design a layout your building can actually take.

  • Free on-site warehouse assessment
  • CAD drawings and pallet position counts
  • Engineer-stamped drawings and capacity figures
  • Relocation, inspection, repair and PSR

Manufactured in Ontario

Built at the North American Steel plants in Whitby and Colborne. Producing racking in Canada since 1972.

  • Structural, teardrop and hybrid rack lines
  • Trusted by Walmart, Home Depot, Toyota and Loblaw
  • Factory direct pricing and lead times
  • R-Mark certified by the Rack Manufacturers Institute
Why it matters

A warehouse designed properly pays for itself

Most floors lose money in the same three places. Here is what we fix.

More pallets in the same building

Space is the most expensive thing you rent. High-density systems like drive-in, push back and double deep hold far more in the same footprint, so you delay the cost of a bigger building.

Faster picking, fewer wasted trips

Aisle widths, pick faces and staging all decide how far your team walks each shift. We lay the racking out around how your product actually moves, not around a catalogue drawing.

Racking that passes inspection

Damaged frames and missing capacity signage are a real liability. We handle engineer drawings and Pre-Start Health and Safety Reviews, plus inspection and repair on racking you already own.

Systems we design and supply
SelectiveDrive-InPush BackDouble Deep CantileverPallet FlowCarton FlowPick Modules MezzaninesRack BuildingsIndustrial Shelving
Warehouses we work in
Distribution centres3PL and logisticsManufacturing Cold storageFood and beverageAutomotiveRetail and e-commerce
Straight answers

Questions we get asked

How fast can I get a quote?

Usually within one business day of the form coming in. For a full layout with drawings we'll book a site visit first, which we can normally arrange the same week.

Who manufactures your racking?

We do, through our executive partnership with North American Steel. Your racking is manufactured at their plants in Whitby and Colborne, Ontario, by a Canadian manufacturer that has been producing pallet racking since 1972. Their systems carry R-Mark certification from the Rack Manufacturers Institute, the North American safety standard for rack manufacturing and design. Because we buy factory direct, you get manufacturer pricing and manufacturer lead times.

Do you handle permits and PSR?

We do. That covers CAD drawings, engineer approvals and Pre-Start Health and Safety Reviews where required.

Do I need a Pre-Start Health and Safety Review?

In Ontario a PSR is generally required for racking, with one common exception: if a new system is installed exactly as shown on the engineered stamped drawing, a PSR is usually not needed. Separately, the OHSA requires signage showing the rated capacity of your racking. If you do not know your capacity, we can review the racking on site and issue a PSR or stamped drawing with the correct signage. We will tell you which one you actually need before you pay for anything.

Can you inspect racking we already have?

Yes. We inspect for damaged frames, missing safety bars and overloaded beams, then quote repairs or replacement parts. If the Ministry of Labour has flagged your racking, tell us on the form and we will prioritise it.

Can you move racking we already own?

Yes. Teardown, transport and reconfiguration are a large part of what we do, including phased moves so you keep operating while the work happens.

Tell us about your warehouse

Send the basics and we'll come back with a layout, a system that fits, and real pricing.

Call (647) 766-3512
Serving the GTA, Hamilton, Kitchener, London and Ottawa · Takes under a minute
Call